- Home
- Case Studies
- Neil S., Shore Line Drive, Alameda
Case Study
Neil S., Shore Line Drive, Alameda
Alameda, CaliforniaNeil S.Completed October 2026$128,000-$133,000

A just-purchased winter home, refreshed within a set budget
Neil S. and his wife had just purchased this Alameda condo as their winter home. The brief was to refresh the home and maximize its small kitchen, and to redo the bathrooms, all within a set budget.
The work ran about three months, from late June to late October 2026. The kitchen was the main focus, with a new master bathroom and powder room, about 600 sq ft of new hardwood flooring, and work through the rest of the condo.
What changed in the condo
Kitchen remodel, the main focus of the project
Master bathroom remodel with a tub-to-shower conversion, linear drain and glass shower door
Powder room remodel
About 600 sq ft of new hardwood flooring
Drywall repair and replacement
Fireplace work
New windows and two sliding doors
Closet systems in both bedrooms
Interior paint throughout
Sub-panel relocation and new switches
City of Alameda permits, handled as part of the job
The small kitchen was remodeled around a large island and light wood cabinets, and the living room now flows to the balcony through new sliding doors. The master bathroom went from a tub to a walk-in shower, and the powder room was remodeled to match.
Full condo remodel, including kitchen and bathrooms
Photo Gallery
More images from the condo remodel.








More transformations
From the kitchen on Shore Line Drive to the hall bathroom on Fernside Avenue, each project shares the same goal: make the room work harder before it looks better. If you want to see what the investment looks like at your address, book a free consultation.
Frequently Asked Questions
The kitchen remodel, a master bathroom remodel with a tub-to-shower conversion, a powder room remodel, about 600 sq ft of new hardwood flooring, new windows and two sliding doors, closet systems in both bedrooms, interior paint throughout and City of Alameda permits.
The work ran about three months, from late June to late October 2026, and was completed in fall 2026.
Your Alameda home, next.
Tell us what you want to change, and we will walk the home with you, price it in the open, and plan the work around your life.
