Real Remodeling Heroes projects with photos, scope, timeline and investment range.

Finished kitchen remodel on Vía Aliso in Alameda

Kitchen Remodel on Vía Aliso, Alameda

A full kitchen replacement and 1,507 sq ft of new flooring for a returning customer, completed with the homeowner's own cabinetry and finishes.

Location:
Alameda
Timeline:
About 8 weeks
Investment:
$60,000-$65,000
Finished kitchen remodel on Killybegs Road in Alameda

Kitchen Remodel on Killybegs Road, Alameda

A full kitchen remodel that opened the kitchen to the living room - light-wood cabinets, quartz counters, an island and a pantry.

Location:
Alameda
Timeline:
Completed October 2026
Investment:
$50,000-$55,000
Completed second-story addition in Redwood City, front exterior

Second-Story Addition on Jefferson Ave, Redwood City

A second-story addition with a new primary bedroom suite and office upstairs, a new primary bathroom and staircase, foundation reinforcement and a full re-roof.

Location:
Redwood City
Timeline:
Completed June 2026
Investment:
$550,000-$600,000
Completed two-level Trex deck in Belmont, front exterior

Two-Level Trex Deck on Wooster Ave, Belmont

A two-level Trex deck and patio build in Belmont, with the top deck rebuilt with new framing and Trex decking, a lower deck on concrete piers, new railings and staircases, and a regraded backyard with a new concrete patio area.

Location:
Belmont
Timeline:
Completed July 2026
Investment:
$160,000-$170,000
Remodeled kitchen in Alameda with natural-wood cabinets, a white island, and stainless appliances

Fernside Whole-Home Remodel and Addition in Alameda

A 300 sq ft addition and complete whole-home remodel in Alameda, with a new kitchen, master bathroom, new bedrooms, mud room, and a new 200-amp panel.

Location:
Alameda
Timeline:
Completed August 2026
Investment:
$350,000-$360,000
Kitchen in the Shore Line Drive condo in Alameda with light wood cabinets and a large island

Neil S., Shore Line Drive, Alameda

A full condo remodel for a just-purchased winter home in Alameda, with a refreshed small kitchen, a master bathroom tub-to-shower conversion, a powder room remodel and about 600 sq ft of new hardwood flooring.

Location:
Alameda
Timeline:
Completed October 2026
Investment:
$128,000-$133,000
Finished living room with fireplace, Miranda Ct, Alameda

Matthew E., Miranda Ct, Alameda

A whole home remodel on Miranda Ct in Alameda, with a kitchen opened to the fireplace, three remodeled bathrooms, 1,800 sq ft of floating floors, two electric fireplaces, and a rebuilt laundry room.

Location:
Alameda
Timeline:
Completed December 2024
Investment:
$183,000-$188,000
Remodeled kitchen with island and dining area, Purcell Drive, Alameda

Justin O., Purcell Drive, Alameda

A complete home remodel on Purcell Drive in Alameda, with a load-bearing wall removed, a kitchen rebuilt around a new island, and all three bathrooms remodeled.

Location:
Alameda
Timeline:
Completed October 2024
Investment:
$158,000-$163,000
Finished kitchen remodel on Pala Ave, in San Leandro

Brooke D., Pala Ave, San Leandro

A kitchen remodel on Pala Ave in San Leandro, with a load-bearing wall removed, a built-in pantry in place of a window, walnut cabinets and a large island with a white stone waterfall counter.

Location:
San Leandro
Timeline:
Completed September 2026
Investment:
$93,000-$98,000
Finished basement on Santa Clara Ave in Alameda

Arianna W., Santa Clara Ave, Alameda

A house lift and new basement in Alameda, finished as a large new basement room with a bathroom.

Location:
Santa Clara Ave, Alameda
Timeline:
Completed April 2025
Investment:
$440,000-$450,000
Construction work on the Burnett St addition in Berkeley

450 Sq Ft Home Addition on Burnett St, Berkeley

A 450 square foot addition in Berkeley with a new bedroom, a master bathroom with a walk-in shower and double-sink vanity, a sunroom, and a laundry room, plus a seismic retrofit, new roofing, hardwood floors, stucco, a Trex deck, new HVAC ducts, and an upgraded main electrical panel.

Location:
Burnett St, Berkeley
Timeline:
Completed February 2026
Investment:
$320,000-$330,000
Finished kitchen on Richmond Ave, Richmond

Kitchen Remodel on Richmond Ave, Richmond

A kitchen remodel on Richmond Ave in Richmond with new flat-panel cabinets, stone countertops, new plumbing, new lighting and a new 200 amp electrical service.

Location:
Richmond Ave, Richmond
Timeline:
Completed December 2024
Investment:
$57,000-$62,000
Finished bathroom on Richmond Ave, Richmond

Master Bathroom Remodel on Richmond Ave, Richmond

A master bathroom remodel on Richmond Ave, Richmond with a new tiled shower, new bathtub and toilet, new vanity with a stone top, and new lighting and electrical.

Location:
Richmond Ave, Richmond
Timeline:
Completed February 2025
Investment:
$24,000-$29,000

Want results like these in your home?

Book a free consultation with Remodeling Heroes and tell us about your project.

Get a Free Consultation

Visit Our Location

2515 Santa Clara Ave #200, Alameda, CA 94501

Remodeling Heroes Logo

© 2026 Remodeling Heroes. All rights reserved.

Our listing on ContractorsRanked

We use cookies to improve your experience and to measure our advertising.